Requests (5,753)
-
Bicycle Issues
CLOSED #24-00441091Evaluated/Addressed Issue - Close SR. Transportation and Public Works staff have evaluated the area. Future issues like this can be reported to District Maintenance for immediate assessment.
-
Bicycle Issues
CLOSED #24-00440780Evaluated/Addressed Issue - Close SR. Transportation and Public Works constructed a protected intersection and bus stop improvements in the area. Construction activity is now substantially complete. For more information, visit https://www.austintexas.gov/sites/default/files/files/Transportation/Bond/Cong_Stass_IS_Fact_Sheet_English_01.31.23.pdf.
-
Bicycle Issues
CLOSED #24-00440525Evaluated/Addressed Issue - Close SR. Transportation and Public Works staff evaluated the area. Future concerns of this nature can be submitted to district maintenance for resolution.
-
Bicycle Issues
People drive in the bike lanes in the mornings on Steck going eastbound.
CLOSED #24-00437805Evaluated/Addressed Issue - Close SR. Transportation and Public Works (TPW) staff evaluated the area. As the facility joins with TxDOT jurisdiction, options are limited to make changes at the intersection. However, markings will be refreshed leading to the intersection. Work will be performed as soon as crew capacity allows.
-
Bicycle Issues
CLOSED #24-00437485Evaluated/Addressed Issue - Close SR. Transportation and Public Works (TPW) staff evaluated the intersection. The lane configuration provides for a through/right lane and left turn only lane. The receiving lane can only accommodate one travel lane, thus the configuration must remain as is.
-
Bicycle Issues
Parking bike lane
CLOSED #24-00435678Evaluated/Addressed Issue - Close SR. Transportation and Public Works staff have referred to Parkin Enterprise for further evaluation.
-
Bicycle Issues
CLOSED #24-00433673Evaluated/Addressed Issue - Close SR. Transportation and Public Works (TPW) evaluated the layout and determined it is installed as intended. However, a re-evaluation of the project will begin in January 2025. TPW staff will included this contact email in the stakeholder list for further feedback. For more information, visit the project page at: https://data.austintexas.gov/stories/s/Safer-Routes-to-Gorzycki-Middle-and-Mills-Elementa/g3i2-3b7e/.
-
Bicycle Issues
CLOSED #24-00432420Referred to Other Agency - Close SR. Work on Montopolis at Crumley was performed by the Central Texas Regional Mobility Authority on behalf of the Texas Department of Transportation. Transportation and Public Works (TPW) is evaluating the area for additional signage. TPW is also preparing a public process for further changes to the Montopolis corridor under the Vision Zero Program. For more information visit www.austintexas.gov/visionzero.
-
Bicycle Issues
CLOSED #24-00429974Evaluated/Addressed Issue - Close SR. Transportation Public Works (TPW) is evaluating the street for missing flex posts and will reinstall any missing flex posts.
-
Bicycle Issues
CLOSED #24-00423967Evaluated/Addressed Issue - Close SR. Transportation and Public Works (TPW) staff will evaluate the location for additional signage, markings and/or enforcement needs.