Requests 1,780 of 2,042,121 2 filters applied
-
Erosion
614 N Commons Ford RdCLOSED · #26-00322876Referred to 311 For Further Review - Close SR. Summary: Investigations Details: During the investigation it was found that this area is maintained by Parks and Recreation. The soil eroding is being stabilized by the roots of the trees on the shoreline. Please forward this to Parks and Recreation for further investigation. See attached photos.
-
Erosion
2600 N Lamar BlvdCLOSED · #26-00318302No Work Planned - No Problem Found - Close SR. Summary: Investigations Details: During the investigation the creek channel at this location was checked and there were no signs of erosion. The creek channel was clear and had no blockage or flood risks. There are no actions for Watershed to take at this time. .
-
Erosion
2113 Highgrove TerCLOSED · #26-00311190No Work Planned - Future Project - Close SR. Summary: Investigations Details: We have investigated the site and sent our documentation to our Field Engineering team. They are aware of the site and will add this documentation to their files. Once an engineer reviews this documentation they will contact you for an additional assessment. No work has been planned at this time.
-
Erosion
5201 Berkman DrCLOSED · #26-00294742Referred to Internal Workgroup - Close SR. Summary: Your request has been referred internally to another workgroup Details: Information will be documented for engineering purposes. Citizen is not requesting a call back. .
-
Erosion
10404 Timbercrest LnRobert from street/bridge leveled off sidewalk but pointed out that there is erosion under sidewalk, beginning @ main water valve, going under sidewalk into yard. Please escalate issue to Austin Water to ensure no leak of any kind. Holes are 2-3'deep & kid foot sized. The holes photographed are 2-3 feet deep and large enough that my kids have stepped in them. we've tried filling them with fire m dirt in the past, believing that it was a critter hole but they continue to come back.
CLOSED · #26-00281725Referred to 311 For Further Review - Close SR. Summary: Details: Please forward this service request to the Austin Water Utility Department, the citizen is referring to a possible leaking water line. Watershed Department does not handle pressurize water.
-
Erosion
1711 Waterloo TrlCLOSED · #26-00265677Referred to 311 For Further Review - Close SR. Summary: Investigation Details: During investigation it was determined that this is a construction site on private property. This needs to be sent to Austin Development Serviced Department for further investigation.
-
Erosion
2803 Loyola LnCLOSED · #26-00263478Referred to Internal Workgroup - Close SR. Summary: Your request has been referred internally to another workgroup Details: Work Group referred to: PARD Aquatics Contact Email: Contact Phone Number: Reason for referral: Service Request # 26-00263478 as a reference.
-
Erosion
Parker Ln & Timber Ridge RdCLOSED · #26-00259653No Action Needed - Private Flooding Issue - Close SR. Summary: Investigations Details: During investigation it was found that this storm drain system is within private property and a part of a private system. There are no actions for Watershed to take because we do not have jurisdiction on private property. It will be the responsibility of the property owner to resolve this issue. Please see attached photos.
-
Erosion
225 W North Loop BlvdCLOSED · #26-00241861No Work Planned - Future Project - Close SR. Summary: Investigations Details: We have investigated the site and sent our documentation to our Field Engineering team. They are aware of the site and will add this documentation to their files. Once an engineer reviews this documentation they will contact you for an additional assessment. No work has been planned at this time.
-
Erosion
4404 Barrow AveCLOSED · #26-00229959No Work Planned - Future Project - Close SR. Summary: Investigations Details: We have investigated the site and sent our documentation to our Field Engineering team. They are aware of the site and will add this documentation to their files. Once an engineer reviews this documentation they will contact you for an additional assessment. No work has been planned at this time.
Hold Shift to view percentages