Reports (1,142)
-
-
Park Maintenance Building Issues
Eave on Springwoods Municipal Pool building is sagging, wood is cracking and separating, and fasteners are working their way out.
OPEN #24-00147308 -
-
-
Park Maintenance Building Issues
CLOSED #24-00142879Issue Repaired - Close SR. Class: WORKORDER Created By: SOLIZM Log Type: ISSUE_REPAIRED Summary: Vandalism No call back number Details.
-
Park Maintenance Building Issues
CLOSED #24-00137942No Issue Found - Close SR. Class: WORKORDER Created By: SOZAM Log Type: NO_ISSUE Summary: not pard responsibility will forward to correct entity Details.
-
-
Park Maintenance Building Issues
The padlock on the women’s bathroom door is preventing the door from locking.
CLOSED #24-00134370Issue Repaired - Close SR. Class: WORKORDER Created By: CAVAZOSC Log Type: ISSUE_REPAIRED Summary: Lock removed Details.
-
Park Maintenance Building Issues
CLOSED #24-00126785Referred to 311 For Further Review - Close SR. Class: SR Created By: Log Type: CSR_FEEDBACK Summary: Non-Pard Property Details non pard property.
-
Park Maintenance Building Issues
Bathroom repair in the park
CLOSED #24-00121177Issue Repaired - Close SR. Class: SR Created By: ALVAREZRI Log Type: ISSUE_REPAIRED Summary: Replaced leaking valve in the chase for urinal. Replaced faucet in the mens bathroom and supply line Details Replaced leaking valve in the chase for urinal. Replaced faucet in the mens bathroom and supply line. work order completed.