Reports (99)

  • Corridor Program - Corridor Feedback

    1332 Sunset Ln, Austin

    Paving is planned for a mulched park trail, on East Side, wrapping around Little Stacy Park. This trail should not be paved, please.

    CLOSED #23-00326143

    CPREFERA. This location is not part of the corridor program.

  • Corridor Program - Corridor Feedback

    2906 Medical Arts St, Austin

    Left behind by crew replacing sewer pipes

    CLOSED #23-00299148

    CPREFERA. This was not left by the Corridor Program. Please forward this to appropriate group.

  • Corridor Program - Corridor Feedback

    S Ih 35 Svrd Sb & W Slaughter Ln, Austin

    CLOSED #23-00297300

    CPREFERA. This is not work for the Corridor Program. I believe the construction is TxDOT. Please forward to the appropriate group.

  • Corridor Program - Corridor Feedback

    Bluebonnet Ln & S Lamar Blvd, Austin

    CLOSED #23-00297222

    CPREFERA. This project is the Austin Energy Reconductoring Project. Please forward to Austin Energy.

  • Corridor Program - Corridor Feedback

    1810 Springdale Rd, Austin

    CLOSED #23-00293155

    CPREFERA.

  • Corridor Program - Corridor Feedback

    2301 E 16th St, Austin

    CLOSED #23-00293121

    CPREFERA.

  • Corridor Program - Corridor Feedback

    5636 N Lamar Blvd, Austin

    If you are going to do construction in the street, I would like to see more efficent work zone traffic controls. Removing an entire turning lane to prevent cars from going into the recieving lane seems a bit much. An organge right turn only sign would alleviate some of the backups on North lamar south bound.

    CLOSED #23-00278241

    CPREFERA.

  • Corridor Program - Corridor Feedback

    800 E Riverside Dr, Austin

    Request for extension of the barrier wall between sidewalk & street all the way to the crosswalk at Alameda & E Riverside. For safety of pedestrians along this dangerous curve

    CLOSED #23-00275195

    CPREFERA.

  • Corridor Program - Corridor Feedback

    5590 E William Cannon Dr, Austin

    At the eastbound approach to the bridge over the creek there is a notable gap in the pavement between the road and the bridge. Previous to the median installation I could look over my shoulder and zag into the travel lane where's there's some asphalt patching to provide a decent transition. Now I have to slow considerably for comfort and to not pop a tire. Can asphalt patching be added to this bridge transition to aid bicyclists?

    CLOSED #23-00266940

    Spoke to Caller - No Further Action Needed - Close SR. 6/5/23 - Forwarded CSR to Randy Harvey, Corridor Program Construction Manager. Email to citizen: CSR#23-00266940 5590 E William Cannon Dr CIITZEN: Dan Hennessey / 440-781-2776 / Hennessey.19@gmail.com COMMENTS: At the eastbound approach to the bridge over the creek there is a notable gap in the pavement between the road and the bridge. Previous to the median installation I could look over my shoulder and zag into the travel lane where's there's some asphalt patching to provide a decent transition. Now I have to slow considerably for comfort and to not pop a tire. Can asphalt patching be added to this bridge transition to aid bicyclists? RESPONSE: As I read the description above, I am wondering if you meant to say the westbound approach to the bridge headed towards I-35? Looking further into this matter, I found an old picture of the westbound approach which fits your description (see pic 2). Please correct me if I'm wrong as my reply is based on the westbound. If this is the same location, I am happy to report that the issue has been addressed. New asphalt has been placed and the approach should be a smooth one (see Pic 3) Citizen Response: Thanks for the response. Understood on the water pooling issue, and thanks for including it in your worklist.

  • Corridor Program - Corridor Feedback

    6501 William Cannon Dr, Austin

    Any time there's any rain a large long puddle forms here, with no opportunity to avoid it. Is there a fix for this?

    CLOSED #23-00266939

    Spoke to Caller - No Further Action Needed - Close SR. 6/5/23 - Forwarded CSR to Randy Harvey, Corridor Program Construction Manager. Response to Citizen: CSR#23-00266939 6501 E William Cannon Dr CIITZEN: Dan Hennessey / 440-781-2776 / Hennessey.19@gmail.com COMMENTS: Any time there's any rain a large long puddle forms here, with no opportunity to avoid it. Is there a fix for this? Thank you so much for providing the photo (see Pic 1) of this issue as it makes it easier to talk about the same thing. We are currently looking into fixing this problem and will put this location in our contractor's schedule to revise and address the issue as work in our other projects permits. For the looks of things, that ramp will need to be rebuilt in such a way as to allow the original water flow to continue down the street and not holding it there Response from Citizen: Thanks for the response. Understood on the water pooling issue, and thanks for including it in your worklist. On the bridge abutment issue, yes! The issue has been addressed and rides great. I thought maybe you rushed out after my 3-1-1 report, but glad you were aware of it aside from that. It makes a real difference heading west over that bridge now.

Filters

Status

Ticket Type

  • Corridor Program - Corridor Feedback (Remove)