Requests (4,046)

  • Park Maintenance - Grounds Electrical Issues

    5902 Johnny Morris Rd, Austin

    Low hanging power line

    CLOSED #24-00392060

    Referred to 311 For Further Review - Close SR. Class: SRCreated By: Log Type: CSR_FEEDBACKSummary: Goes to Austin EnergyDetailsGoes to Austin Energy.

  • CLOSED #24-00391886

    No Issue Found - Close SR. Class: WORKORDERCreated By: Log Type: NO_ISSUESummary: Main disconnect switch was in off position when arrivedDetailsturned the main switch back on and locked in on position, tested outlets and found them working correctly before leaving.

  • CLOSED #24-00391042

    No Issue Found - Close SR. Class: WORKORDERCreated By: Log Type: NO_ISSUESummary: Power is shut off due to vandalismDetailspower is only available to reservations and shut off at other times due to unhoused individuals, this is determined by the Parks supervisors and directors and electrical department unfortunately has no say in the energizing and de-energizing of outlets.

  • CLOSED #24-00390967

    Issue Repaired - Close SR. Class: WORKORDERCreated By: Log Type: ISSUE_REPAIREDSummary: Request lights to stay on from 7:00 am to 9:00 am.DetailsReset clock from 6;00 am to 9:00 am.

  • CLOSED #24-00390961

    Referred to 311 For Further Review - Close SR. Class: SRCreated By: Log Type: CSR_FEEDBACKSummary: NON-PARD PROPERTYDetailsAddress provided isNON-PARD PROPERTY.

  • CLOSED #24-00390840

    No Issue Found - Close SR. Class: WORKORDERCreated By: Log Type: NO_ISSUESummary: Details.

  • CLOSED #24-00390791

    No Issue Found - Close SR. Class: WORKORDERCreated By: Log Type: NO_ISSUESummary: Details.

  • Park Maintenance - Grounds Electrical Issues

    2800 Webberville Rd, Austin

    CLOSED #24-00389577

    No Issue Found - Close SR. Class: WORKORDERCreated By: Log Type: NO_ISSUESummary: Construction in area affecting lightingDetailsthe city of Austin neighborhood outreach building that the playground is behind is being renovated. With this as they are redoing the electrical and mechanical equipment in the building multiple circuits are going to be turning off and on constantly, this is causing the time clock that controls the time for the lighting will consistently be off the correct time until the project is completed in May 2025.

  • CLOSED #24-00389331

    No Issue Found - Close SR. Class: WORKORDERCreated By: Log Type: NO_ISSUESummary: Not owned by COA parks and recreation departmentDetailscannot touch if not owned by P&R department due to liability. Tried to find who owns the land but no signage in area and no information online.

  • Park Maintenance - Grounds Electrical Issues

    2611 Webberville Rd, Austin

    CLOSED #24-00389274

    No Issue Found - Close SR. Class: WORKORDERCreated By: Log Type: NO_ISSUESummary: All this was a misunderstandingDetails.

Filters

Status

Ticket Type

  • Park Maintenance - Grounds Electrical Issues (Remove)