Requests (4,861)

  • Street Resurfacing

    814 E 46th St, Austin

    When the city recently repaved 46th St between Red River and Caswell, they removed the channel that had been added several years ago to allow water to drain down the street properly. We had tried to get the city to fix the problem for years, as the water pools so deep that it sits for days, it forces pedestrians to walk out into busy Red River St to cross 46th, and definitely makes it impossible for disabled people to use the curb ramp. Please come back out and re-install the drainage channel.

    CLOSED #25-00222092

    Referred to 311 For Further Review - Close SR. Class: SR Created By: Log Type: CSR_FEEDBACK Summary: Routed to 3-1-1 for reassignment. Details  Thank you for your request. Please send to Watershed for initial investigation. If watershed has already investigated, please send back with watersheds findings. Thank you.

  • Street Resurfacing

    2601 Kinney Oaks Ct, Austin

    CLOSED #25-00221260

    Referred to 311 For Further Review - Close SR. Class: SR Created By: Log Type: CSR_FEEDBACK Summary: Routed to 3-1-1 for reassignment. Details Thank you for your request. Street and Bridge Operations forwarded this request back to 3-1-1 for the appropriate department assignment. Please forward to Watershed for initial investigation.

  • Street Resurfacing

    1520 Rutherford Ln, Austin

    OPEN #25-00221190
  • Street Resurfacing

    E 51st St & Springdale Rd, Austin

    CLOSED #25-00217286

    No Action Needed - Close SR. Class: WORKORDER Created By: Log Type: NO_ACTION Summary: No problem found. Details Thank you for your request. SBO has reviewed your request and determined that there is no issue found. No further action required.

  • Street Resurfacing

    2516 E 8th St, Austin

    OPEN #25-00217236
  • Street Resurfacing

    E St Johns Ave & Blessing Ave, Austin

    CLOSED #25-00214958

    Future Resurfacing Planned - Close SR. Class: SR Created By: Log Type: FUTURE_RESURF Summary: Future Repairs Planned Details Transportation Public Works Utilities and Structures Division received  your request and confirmed that Austin Water has submitted Ticket #  *UER25-2276829* for the permanent repair. At this time, it is in queue to be  processed for a Dig Tess ticket along with a permit application. Our  current estimated time for final restoration is 60-90 days, weather  permitting. For questions or project updates, please contact (512)974-8777. Thank you.

  • Street Resurfacing

    E Riverside Dr & Old East Riverside Dr, Austin

    CLOSED #25-00214876

    Temp. Repair Complete - Final Pending - Close SR. Class: WORKORDER Created By: Log Type: TEMP_REPAIR Summary: Temporary repair completed, pending final resolution. Details Thank you for your request. Street and Bridge Operations completed your request and has notified the appropriate Street and Bridge Operations workgroup for follow-up, if any. If you have any questions regarding this request, please contact Street and Bridge Operations Dispatch at (512) 974-8777 and provide work order number 25-194162 as a reference.

  • Street Resurfacing

    4615 Peach Grove Rd, Austin

    CLOSED #25-00214439

    Future Resurfacing Planned - Close SR. Class: WORKORDER Created By: Log Type: FUTURE_RESURF Summary: Future Maintenance Details The contractor will be back to fog seal areas that were covered by cars. It will be done at the end of the work assignment.

  • Street Resurfacing

    Hillview Rd & Hillview Green Ln, Austin

    CLOSED #25-00214065

    No Action Needed - Close SR. Class: WORKORDER Created By: Log Type: NO_ACTION Summary: See details. Details Thank you for contacting City of Austin regarding pavement maintenance operations in your neighborhood. The treatment that is scheduled is a fog seal, in which asphalt emulsion (no rocks) will be placed as a thin surface treatment on the existing pavement. It is part of the pavement maintenance cycle and has been proven to help lock in rocks from seal coats performed 1-2 years prior. The seal coat rocks fill small cracks and prevent them from worsening. The fog seal insures that they continue to do that. All of this reduces the need for more extensive (and expensive) maintenance in the years to come. /this was one of about 60 streets City wide each year where the fog seal treatment was considered to be the best treatment to preserve the underlying pavement/. With further questions, please call 311.

  • Street Resurfacing

    2809 Singlefoot Ln, Austin

    THE ROAD IS CRUMBLING, URGENT ASPHALT RESURFACE NEEDED

    DUPLICATE (CLOSED) #25-00213945