Requests (4,893)
-
Street Resurfacing
Road workers not closing road while pouring wet tar. Has now ruined car tires, due to being forced to pass on the opposite side of the road and unavoidable driving over wet tar. I now have to replace the tires through no fault of my own.
OPEN #25-00132853 -
Street Resurfacing
CLOSED #25-00132588Referred to 311 For Further Review - Close SR. Class: SR Created By: Log Type: CSR_FEEDBACK Summary: Routed to 3-1-1 for reassignment. Details Thank you for your request. Street and Bridge Operations forwarded this request back to 3-1-1 for the appropriate department assignment. Please forward to Watershed for initial investigation.
-
Street Resurfacing
CLOSED #25-00132394No Action Needed - Close SR. Class: WORKORDER Created By: Log Type: NO_ACTION Summary: Left voice message. Details Called citizen and left voice message stating that work is planned for April 30th, weather and equipment permitting. We will be able to tow the car to the next available parking spot, next block. Please call us with questions 572-974-8777. .
-
Street Resurfacing
Degradation of road
CLOSED #25-00132023Future Resurfacing Planned - Close SR. Class: WORKORDER Created By: Log Type: FUTURE_RESURF Summary: Street and Bridge Operations completed request, internal workgroup notified. Alligator Cracking. Details Thank you for your request. Street and Bridge Operations completed your request and has notified the appropriate Street and Bridge Operations workgroup for follow-up, if any. If you have any questions regarding this request, please contact Street and Bridge Operations Dispatch at (512) 974-8777 and provide work order number 25-189612 as a reference. Roadway is starting to alligator crack along the left lane.
-
Street Resurfacing
CLOSED #25-00131919No Action Needed - Close SR. Class: WORKORDER Created By: Log Type: NO_ACTION Summary: TPW - Street Resurfacing / dip, on William Cannon WB, intersection with Brodie Details Used 1 bag on uneven surface of the road made safe. See pics.
-
Street Resurfacing
OPEN #25-00131577 -
Street Resurfacing
Workers recently tore up the road on Gillis St between Redd St and Casey St. While some sections have been patched, the road remains extremely rough and uneven. Additionally, large amounts of dirt that were excavated are still sitting on the road surface. When it rains, this creates a thick mud making the area very hazardous for drivers. Please advise if there’s a timeline for proper resurfacing and cleanup. This is a serious safety concern.
CLOSED #25-00130988Future Resurfacing Planned - Close SR. Class: SR Created By: Log Type: FUTURE_RESURF Summary: Routed this to the Project Manger Details I notified the project manager Matt Harold of this complaint and sent him contact information for the citizen. thank you. .
-
Street Resurfacing
CLOSED #25-00127792No Action Needed - Close SR. Class: WORKORDER Created By: Log Type: NO_ACTION Summary: Street and Bridge Operations removed debris. Details Thank you for submitting your request. Street and Bridge Operations reviewed your request and cleared the debris. If you have any questions regarding this request, please contact Street and Bridge Operations Dispatch at (512) 974-8777 and provide work order number 25-188830 as a reference.
-
Street Resurfacing
CLOSED #25-00127179No Action Needed - Close SR. Class: WORKORDER Created By: Log Type: NO_ACTION Summary: Core holes Details Thank you for your request. Street and Bridge Operations reviewed and completed your request. If you have any questions regarding this request, please contact Street and Bridge Operations Dispatch at (512) 974-8777 and provide work order number 25-188792 as a.
-
Street Resurfacing
CLOSED #25-00127003No Action Needed - Close SR. Class: SR Created By: Log Type: NO_ACTION Summary: Called Resident Details Spoke with resident and informed her that we update the recording between 2:00pm-3:00pm each day with streets the following day. Also advised that this is weather and equipment permitting. Also advised that sealcoat process is quick. .