Reports (459)
-
-
Parks - Building Electric Issues
CLOSED #24-00258632Issue Repaired - Close SR. Class: WORKORDER Created By: SWIADERM Log Type: ISSUE_REPAIRED Summary: Restroom lights Details Work is contracted to Austin energy. They were on site in May however a lock out tag out from third party contractor was on the disconnect. Austin energy left without performing work at the time. Lock out tag out has been removed since then. No completion date has been given for continuing restoring power to restroom pavilion from Austin energy.
-
Parks - Building Electric Issues
CLOSED #24-00254747Issue Repaired - Close SR. Class: WORKORDER Created By: SWIADERM Log Type: ISSUE_REPAIRED Summary: Court lights Details The lights for the ball courts were not turning on at night, I apologize for the inconvenience as this was my error from a simple mistake. The time clock that controls the tennis and basketball court lights was changed on 07/11/24 from a mechanical time clock to a digital one that has a battery back up protection. It was switched to this style so that if there is a power spike or outage in the area the circuit will fall back on the battery backup and equipment will not have to be reset manually after those instances. The programmed time will remain the same coinciding with the park hours. I unfortunately hit the mode button a single time to many when programming the time and left it set to manual override instead of automatic timed events. The issue has been resolved and the lights are working correctly again as of 7/16//24.
-
Parks - Building Electric Issues
CLOSED #24-00246421Issue Repaired - Close SR. Class: SR Created By: ALVAREZRI Log Type: ISSUE_REPAIRED Summary: Repaired leak. Details Repaired leak.
-
Parks - Building Electric Issues
CLOSED #24-00231304Referred to 311 For Further Review - Close SR. Class: SR Created By: THAYERS Log Type: CSR_FEEDBACK Summary: NON-PARD PROPERTY Details NON-PARD PROPERTY.
-
Parks - Building Electric Issues
Electricity is out
CLOSED #24-00229692Referred to 311 For Further Review - Close SR. Class: SR Created By: THAYERS Log Type: CSR_FEEDBACK Summary: NON-PARD PROPERTY Details NON-PARD PROPERTY, Goes to Austin Energy.
-
Parks - Building Electric Issues
CLOSED #24-00226861Issue Repaired - Close SR. Class: WORKORDER Created By: DAWSOND Log Type: ISSUE_REPAIRED Summary: Pard electrician replaced timer. Details.
-
Parks - Building Electric Issues
CLOSED #24-00192146No Issue Found - Close SR. Class: WORKORDER Created By: ESTRADAJ Log Type: NO_ISSUE Summary: need more information Details.
-
Parks - Building Electric Issues
OPEN #24-00189488Scheduled Repair. Class: WORKORDER Created By: SWIADERM Log Type: SCHEDULE_REPAIR Summary: Austin energy could not perform work with elk lock out tag out in place Details Contacted Lloyd and Shawn from elk electric and sent them photos of the lock/ disconnect, and work order request summary. I will resolve the lock issue with them and if no timely response is available I will cut the lock off with bolt cutters .
-
Parks - Building Electric Issues
CLOSED #24-00172651Issue Repaired - Close SR. Class: WORKORDER Created By: SWIADERM Log Type: ISSUE_REPAIRED Summary: AISD changed time sensor that was off due to daylight savings and extended hours of natural light Details.