Reports (2,255)

  • Park Maintenance - Building Plumbing Issues

    E Cesar Chavez St & N Ih 35 Svrd Sb, Austin

    OPEN #24-00178007
  • OPEN #24-00177978
  • Running drinking fountain

    OPEN #24-00177226
  • Toilet clog at miro rivera

    OPEN #24-00173292
  • Mop sink is not draining tried to plug it won’t go down

    OPEN #24-00172931
  • OPEN #24-00172528

    NONE. steve martl with parks and recreation called in at 7:03 pm will work, please close out.

  • Park Maintenance - Building Plumbing Issues

    7806 N Capital of Texas Hwy SB, Austin

    There is human waste behind the toilets at Bull Creek. They need to be repaired & this area cleaned ASAP.

    OPEN #24-00169858
  • CLOSED #24-00168413

    Issue Repaired - Close SR. Class: SR Created By: ALVAREZRI Log Type: ISSUE_REPAIRED Summary: Fixed broken bubbler and hoses Details Fixed broken bubbler and hoses.

  • Park Maintenance - Building Plumbing Issues

    1619 Nash Hernandez Sr Rd, Austin

    Repair request #24-00138405 has been changed to completed, but the issue persists. The water fountain still does not work, specifically the lower third of the fountain where the dogs would drink water. There is not running water and it will be important in the upcoming summer months. Thank you.

    CLOSED #24-00167014

    Issue Repaired - Close SR. Class: SR Created By: ALVAREZRI Log Type: ISSUE_REPAIRED Summary: turn water to Fountain Details turn water to Fountain.

  • CLOSED #24-00166428

    Issue Repaired - Close SR. Class: SR Created By: ALVAREZRI Log Type: ISSUE_REPAIRED Summary: Repaired spicket. Details Repaired spicket.

Filters

Status

Ticket Type

  • Park Maintenance - Building Plumbing Issues (Remove)