Reports (4,256)
-
-
Street Resurfacing
CLOSED #24-00271564Future Resurfacing Planned - Close SR. Class: WORKORDER Created By: CONSTANCIORO Log Type: FUTURE_RESURF Summary: SBO - Street Resurfacing - trucks blocking street - 4141 TERRY O LN Details Thank you for your request. Street and Bridge Operations completed your request and has notified the appropriate Street and Bridge Operations workgroup for follow-up, if any. If you have any questions regarding this request, please contact Street and Bridge Operations Dispatch at (512) 974-8777 and provide work order number 24-177733 as a reference.
-
Street Resurfacing
Incomplete street resurfacing by employees of the City. Left the section in front of my house unpaved and at a lower level compared to the rest of the street.
CLOSED #24-00271244No Action Needed - Close SR. Class: WORKORDER Created By: SANCHEZRO Log Type: NO_ACTION Summary: Street and Bridge Operations completed request, internal workgroup notified. Details Thank you for your request. Street and Bridge Operations completed your request and has notified the appropriate Street and Bridge Operations workgroup for follow-up, if any. If you have any questions regarding this request, please contact Street and Bridge Operations Dispatch at (512) 974-8777 and provide work order number 24-177728 as a reference. Previous work done on 7/19/2024.
-
Street Resurfacing
OPEN #24-00271061Referred to Engineering/Pavement Management. Class: WORKORDER Created By: MAYSJA Log Type: REF_ENG-PVMT Summary: Street and Bridge Operations completed request, internal workgroup notified. Details Thank you for your request. Street and Bridge Operations completed your request and has notified the appropriate Street and Bridge Operations workgroup for follow-up, if any. If you have any questions regarding this request, please contact Street and Bridge Operations Dispatch at (512) 974-8777 and provide work order number 24-177705 as a reference.
-
-
-
-
Street Resurfacing
Newly completed street paving project done at Barton Skyway and Rae Dell Ave. It was a poorly done job. Please inspect where car tires have created deep grooves in the new asphalt. The other issue is the amount of gravel debris that is left in the dedicated bike lane and on the ADA ramp. This hazard has been like this for a couple of weeks. This is a safety hazard and is unacceptable. Please do a follow up inspection on this job.
OPEN #24-00262028 -
Street Resurfacing
Oltorf has become dangerously uneven following the construction over the past few months. It’s caused me tire issues, and I’m sure it’s causing others problems as well. I’ve also witnessed cars bouncing around after hitting bumps.
DUPLICATE (OPEN) #24-00260743 -
Street Resurfacing
A crew put in a pipe down Oltorf and tore up the road, leaving it extremely uneven. It has caused a lot of car issues for those that commute daily.
OPEN #24-00260739