Is the issue in one area of the street or entire street?One Area of StreetHas there been recent construction on the street?Yes
- Location
-
E 51st St & Berkman Dr
30.30390654, -97.69887573
CLOSED
·
#24-00435539
Future Resurfacing Planned - Close SR. Class: WORKORDERCreated By: Log Type: FUTURE_RESURFSummary: Repairs plannedDetailsE 51st St street pavement from I-35 to Berkman Dr was inspected on 12/5/2024. The areas that are in need of temporary repairs were identified and S&B Ops has been informed. This section of 51st street is planned for resurfacing along with other mobility improvements as part of/E 51st St Revitalizatio/n Capital Improvement Project.