- What is the issue? Rough
- Is the issue in one area of the street or entire street? One Area of Street
- Has there been recent construction on the street? Yes
CLOSED
#24-00435539
Future Resurfacing Planned - Close SR. Class: WORKORDERCreated By: Log Type: FUTURE_RESURFSummary: Repairs plannedDetailsE 51st St street pavement from I-35 to Berkman Dr was inspected on 12/5/2024. The areas that are in need of temporary repairs were identified and S&B Ops has been informed. This section of 51st street is planned for resurfacing along with other mobility improvements as part of/E 51st St Revitalizatio/n Capital Improvement Project.