Street Resurfacing

6800 Glen Ridge Dr, Austin

CLOSED #25-00032891

Future Resurfacing Planned - Close SR. Class: SRCreated By: Log Type: FUTURE_RESURFSummary: Future Maintenance PlannedDetailsTransportation Public Works Utilities and Structures Division received your request and confirmed that Austin Water has submitted Ticket UER25-2257531 for the permanent repair. At this time, it is in queue to be processed for a Dig Tess ticket along with a permit application. Our current estimated time for final restoration is 60 to 90 days, weather permitting. For questions or project updates, please contact (512)974-8752. Thank you.

Opened
Closed
Description
Location
6800 Glen Ridge Dr, Austin
30.35615602, -97.76727192
Additional Details
What is the issue? Recent Resurface Issues
When was the work done? Within last month
What is the complaint? Not enough rock used, Didn't cover the entire street, Too much tar on the road
Has there been recent construction on the street? No

Activity

  • Submitted

  • Opened

  • Closed