Parks - Building Electric Issues

3001 Harris Park Ave, Austin

CLOSED #25-00191304

Issue Repaired - Close SR. Class: WORKORDER Created By: Log Type: ISSUE_REPAIRED Summary: AE and elk electric repaired damage done by storm and completed new installation Details multiple tree collapses caused a utility pole to be damaged and wiring to fall from pole to restroom panel and to another pole light. AE removed all storm damage debris and deenergized site from transformers. Elk electric replaced overhead quadruplex wires, weatherhead, and panel wiring to re-energize site. Spot flood lighting in area was also repaired/replaced at the same time by PARD electrical staff.

Opened
Closed
Description
Location
3001 Harris Park Ave, Austin
30.29052499, -97.73140763
Additional Details
Where is the issue located? Restroom - Women's
Does this issue impact a pending or in progress event? Yes

Activity

  • Submitted

  • Opened

  • Closed