- Opened
- Closed
- Description
- Location
-
5918 Clementine Ln, Austin
30.19725626, -97.72784519 - Additional Details
- What is the issue? Recent Resurface Issues
- When was the work done? Within last month
- What is the complaint? Didn't cover the entire street
- Has there been recent construction on the street? No
CLOSED
#25-00198739
Future Resurfacing Planned - Close SR. Class: WORKORDER Created By: Log Type: FUTURE_RESURF Summary: Future Resurfacing Planned Details The turning circle on CLEMENTINE LN will be fog sealed along with the rest of the neighborhood later this summer by the TPW/SBO fog seal crew. The exact date will depend on weather conditions, but residents will receive door hanger notices approximately three days before the work begins. Fog sealing is used on both past sealcoat and slurry seal treatments. Since the turning circle has a slurry seal surface, both sections of the street will now be fog sealed at the same time. This treatment method is standard practice for turning circles across the City.
Activity
-
Submitted
Opened
Closed