- Opened
- Closed
- Description
- Location
-
2804 Singlefoot Ln, Austin
30.21010573478229, -97.69073244924162 - Additional Details
- What is the issue? Pavement Failure
Future Maintenance Planned - Close SR. Class: SR Created By: Log Type: FUTURE_MAINTPLAN Summary: Future Resurfacing Planned Details Thank you for your request. Street and Bridge Operations has reviewed your request and confirmed that the location provided has been forecast for future resurfacing. Singlefoot Ln and Rusty Dr are scheduled to receive overlay treatments this year. /*Overlay:* Mill and overlay involves grinding up the existing asphalt and base material, removing it, and applying new pavement. The end result will be a much smoother driving surface. Overlay consists of a single layer of hot mix asphaltic concrete used to level, waterproof, and restore the original street shape and ride. / Hoeke Ln (from E Riverside Dr to Rusty Dr) will receive a sealcoat treatment. /*Sealcoat:* Sealcoat consists of spraying a thin layer of asphalt and water mixture over the pavement followed by a thin layer of small gravel. This is done to seal the existing street surface and to increase skid resistance. Sealcoat must be done in warm, dry weather, so work is typically done between months of April and October. /.
Activity
-
Submitted
Opened
Closed