- Curb was taken out by city during a water line repair. Road is compromised. Is there a plan to repair the curb and the street? If you could provide any details and timeline as to when the street and curb will be repaired, that would be much appreciated.
- Location
-
10501 La Costa Dr, Austin
30.14320357657225, -97.78692201279175 - Additional Details
- What is the issue? Missing Section
- What side of the street is the curb/gutter located on? East
Future Maintenance Planned - Close SR. Class: SR Created By: Log Type: FUTURE_MAINTPLAN Summary: Future Repairs Planned Details Transportation Public Works-Utilities and Structures Division has received your request and confirmed that Austin Water submitted Ticket #UER25-2302059 for the permanent repair on August 6, 2025. At this time, it is in the queue for processing, including a Dig Tess ticket and a permit application. The current estimated timeframe for final restoration is 90-120 days, weather permitting. If the UER ticket is less than 90 days old, please contact Austin Water at 512-972-1000 for any temporary repairs. For questions or project updates after 90 days, please contact Street and Bridge at (512) 974-8777.
Activity
-
Submitted
Opened
Closed