- What is the issue? Lack of Notification for Resurfacing
- Is the issue in one area of the street or entire street? Entire Street
- Has there been recent construction on the street? Yes
CLOSED
#26-00076525
No Action Needed - Close SR. Class: SR Created By: Log Type: NO_ACTION Summary: Attempted to Call Details Thank you for your request. Street and Bridge attempted to contact the resident but were unable to reach them, and the voicemail box was full. Resurfacing work is currently underway on E Yager Lane, which is scheduled to receive an overlay treatment. Crews are working on E Yager Lane from Tech Ridge to Parmer, milling the existing pavement and then repaving the street. The resident is welcome to contact Street and Bridge directly at 512-974-8777 for any further questions.