- Description
- City laid down new asphalt—nice job; but NOW crew is blowing debris—sand, gravel & small rocks from the street toward the curb & into residents’ yards & driveways, some still piled on curb;the blower is unable to blow it higher, due to the volume of debris—left over from scraping the road prior to resurfacing. Photos: 1.my driveway, 5612 Lark Creek Dr, 2. EastToward 5614 Lark Creek Dr. 3. crew after passing by. Rocks in yard creates a hazard while mowing, & driveways will need sweeping! REALLY?
- Additional Details
-
What is the issue?Recent Resurface IssuesWhen was the work done?Within last weekHas there been recent construction on the street?Yes
- Location
-
5612 Lark Creek Dr, Austin
30.194002543996987, -97.73252249868037
CLOSED
·
#26-00115394
Temp. Repair Complete - Final Pending - Close SR. Summary: Debris in Street
Details: Debris was moved from the curb line.