Requests (99)
-
Corridor Program - Corridor Feedback
Roadway Safety Upgrade - IVO Parmer Lane and Avery Ranch intersection
CLOSED #22-00071952CPREFERA. This location is not on a CPO corridor.
-
Corridor Program - Corridor Feedback
Poor & uneven road surface conditions.
CLOSED #22-00047912CPREFERA. This is not under the scope of CPO.
-
Corridor Program - Corridor Feedback
the newly constructed 183NB on-ramp from I35NB has some severe dips in the last slabs of concrete before the ramp banks west. a ramp that is notorious for backups and was out of operation for a number of months, only to be reopened with these huge dips, which pose a safety concern not only as a bump while traveling on an elevated ramp, but the worst bump occurs right at a surface material change and a turn to the left. to what standards are contractors held?
CLOSED #22-00032786CPREFERA. This CSR is not related to the Corridor Program Office's work. This community member should be referred to TxDOT.
-
Corridor Program - Corridor Feedback
1st and Congress Austin TX
CLOSED #22-00021142CPREFERA.
-
Corridor Program - Corridor Feedback
Grass is too long and hinders view does those trying to turn right onto airport from koenig
CLOSED #22-00010926CPREFERA. Location is on Koenig, not Airport corridor; I believe Public Works Street and Bridge Operations handles mowing requests.
-
Corridor Program - Corridor Feedback
Ever since the construction the lane paint is very confusing, especially at night heading north on Lamar. The paint used to black out the original lanes is more reflective than the actual white paint causing confusion on where the lanes actually are.
CLOSED #22-00010921CPINNFAN. I contacted the Project Manager for NOLA, Daryl Ruybal, who noted that while we did have some work in the area back in 2020, we do not have any current construction in the area. He did confirm that a complaint was made about the lanes previously and the COA was not able to fix it for some reason. He will pass on the complaint to Sean McLeod to see what can be done.
-
Corridor Program - Corridor Feedback
A section of Burleson Road was recently repaved but the lane markers and bike lane stripe have not been added yet and cars are speeding through the corridor.
CLOSED #22-00007079CPREFERA.
-
Corridor Program - Corridor Feedback
Connect monterrey oaks Blvd to southwest parkway. Small tract of unoccupied land to connect would alleviate traffic on Boston Ln, William Cannon, and Sw parkway @ Mopac. Provides easy access to freeway onramps
CLOSED #22-00000452CPREFERA. Not part of CPO's improvements.
-
Corridor Program - Corridor Feedback
Why are you cutting down trees on the island between Cork Path & West Gate? Also need to pick up dead branches around other trees on islands in front of Taqueria Arandas.
CLOSED #21-00552847CPREFERA. Not a CPO corridor.