Requests (1,656)
-
Erosion
Erosion alongside house
CLOSED #25-00218613Future Work Scheduled - Close SR. Class: SR Created By: Log Type: WO_CREATED Summary: Investigation Details Work order number 25-202510 has been created for Watershed Protection Field Engineering to assess the site at 5336 Agatha Cir.
-
Erosion
CLOSED #25-00217100Future Work Scheduled - Close SR. Class: WORKORDER Created By: Log Type: WO_CREATED Summary: Investigations. Details Please have your crews evaluate this area. The initial service request was transferred to Austin Water Utility because a broken water line, as shown in the attached photos, was causing erosion. However, it has since been rerouted back to Watershed. I have included the photos for reference.
-
Erosion
CLOSED #25-00201301Referred to 311 For Further Review - Close SR. Class: SR Created By: Log Type: CSR_FEEDBACK Summary: Investigation Details Upon investigation, Watershed utilities in the area are not causing erosion of the pavement. The citizen was contacted and informed me that the pavement in front of their property is eroding. Please transfer this service request to Street and Bridge Operations for pavement fixture. Photos of the erosion and Right of Way are attached. (see photos in attachments).
-
Erosion
CLOSED #25-00201022No Work Planned - Future Project - Close SR. Class: SR Created By: Log Type: FUTURE_PROJ Summary: Investigation Details During investigation it was determined that there is a file regarding the erosion at this site. The photos have been added to the folder, and an email has been sent to the engineering team.
-
Erosion
CLOSED #25-00198707No Work Planned - No Problem Found - Close SR. Class: SR Created By: Log Type: NO_PROBLEMFOUND Summary: Investigation Details During investigation it was determined that this is a private property concern. The property owner is responsible for maintenance. .
-
Erosion
Tree erosion / debris behind bank lot and empty lot, runs into Colorado river on the far side of the longhorn dam
CLOSED #25-00197074Referred to 311 For Further Review - Close SR. Class: SR Created By: Log Type: CSR_FEEDBACK Summary: Investigation Details During investigation it was determined that this area is Parks and Recreation Department's property. This needs to be sent to Park and Recreation Department for further investigation. .
-
Erosion
There is a soil banked ditch for street drainage on an easement on my property and I noticed some sections appear to be washing out some, and was interested in the city having a civil engineer or similar inspect the embankment to ensure there wasn't a risk of failure as my house is directly adjacent to it. Photos showing the washout and location of the ditch on Google maps.
CLOSED #25-00194782No Work Planned - Future Project - Close SR. Class: SR Created By: Log Type: FUTURE_PROJ Summary: Investigation Details Upon investigation, the erosion in the area has been documented and photographed and the Watershed Engineering team has been notified of the erosion in the area. (See photos in attachments).
-
Erosion
Since the storm, erosion is getting way worse and we are losing our yard. I'd like to talk to someone at watershed protection the week of June 16 if possible. Our rear easement has a 4' storm drain underground, that pops out and turns into a dry creek bed in between EdgeRock and rockpoint Dr, but pops out halfway through our property. The othe side of the creek has a retaining wall. We do not. We have lost a ton of dirt from this flow, and now we lost a huge tree, the erosion barrier helping us
CLOSED #25-00193737No Work Planned - Future Project - Close SR. Class: SR Created By: Log Type: FUTURE_PROJ Summary: Investigations Details We have investigated the site and sent our documentation to our Field Engineering Erosion team. They are aware of the site and will add this documentation to their files. Once an engineer reviews this documentation they will contact you for an additional assessment. No work has been planned at this time.
-
Erosion
CLOSED #25-00189698No Work Planned - Future Project - Close SR. Class: SR Created By: Log Type: FUTURE_PROJ Summary: Investigations Details We have investigated the site and sent our documentation to our erosion team. They are aware of the site and will add this documentation to their files. No work has been planned at this time.
-
Erosion
CLOSED #25-00184776Future Work Scheduled - Close SR. Class: WORKORDER Created By: Log Type: WO_CREATED Summary: Investigation Details maximo work order #25-201024 has been created for tv crews to inspect pipe system for possible blockage. Citizen has been contacted. .