Reports (3,491)

  • Drainage Pond Maintenance

    W William Cannon Dr & Beckett Rd, Austin

    CLOSED #24-00271839

    Vegetation Maintenance - Close SR. Class: SR Created By: MORGANJ Log Type: VEG_MAINTENANCE Summary: Creek Flag 68 Details Called and left a voice mail with the customer on July 26, 2024 at 3:02 pm. He returned my call immediately. In trying to determine the exact location of the area he was referencing, we determined it was part of Williamson Creek south of William Cannon, east of Becket Road and north of Wheeler Branch Road. Creek Flag 68 begins behind the residence located at 7109 Wheeler Branch Road and runs southeast. I am going email the Creeks coordinator and see if this is something he can address or if we should forward it to Open Water Ways. Juliet Morgan.

  • Drainage Pond Maintenance

    1000 W Rundberg Ln, Austin

    CLOSED #24-00271114

    Vegetation Maintenance - Close SR. Class: SR Created By: MORGANJ Log Type: VEG_MAINTENANCE Summary: Pond Flag 485 Details *Pond Flag 485:*This pond is maintained four times annually and was last maintained in March. It is on the schedule for maintenance in July; however, due to the frequent rains in April and May, the contractor has been running a bit behind schedule. The contractor should be able to visit the pond in the next two weeks.

  • Drainage Pond Maintenance

    13700 Bavarian Forest Dr, Austin

    CLOSED #24-00269347

    NOWPFPCS. Class: SR Created By: SOLISJO Log Type: FUTURE_PROJ Summary: Investigation Details Residential Pond: 2137058.

  • Drainage Pond Maintenance

    3100 Oak Springs Dr, Austin

    CLOSED #24-00268979

    Vegetation Maintenance - Close SR. Class: SR Created By: MORGANJ Log Type: VEG_MAINTENANCE Summary: Pond Flag 147.1 Details *Pond Flag 147.1:*August 1st is less than a week away. I have asked the contractors to prioritize this pond for their August schedule. There are over 200 ponds in the Wildflower Meadow Program which haven't been maintained since February or earlier. With the extra rain we've had this Spring and Summer, there has been a lot of vegetation growth in these and all the ponds the Watershed Protection Department maintains. The contractor is still working on the maintenance schedule for July; however, they will maintain the pond at Oak Springs as soon as they possibly can.

  • Drainage Pond Maintenance

    S 1st St & Desert Primrose Dr, Austin

    CLOSED #24-00267608

    Vegetation Maintenance - Close SR. Class: SR Created By: MORGANJ Log Type: VEG_MAINTENANCE Summary: Pond Flag 967 Details *Pond Flag 967:*This pond has received multiple service requests within the last two weeks. This pond is typically maintained 4 times annually and was last maintained on June 22, 2024. However, the contractor missed the area adjacent to South 1st Street near the bus stop. On July 9, 2024 the contractor was notified that they missed the area and a request was made for them to revisit the area to complete the work. On July 15th and July 24th, the contractor was also reminded and requests were made for them to revisit and complete the work. The contractor will return when they can to complete the work.

  • Drainage Pond Maintenance

    3100 Oak Springs Dr, Austin

    CLOSED #24-00267493

    Vegetation Maintenance - Close SR. Class: SR Created By: MORGANJ Log Type: VEG_MAINTENANCE Summary: Pond Flag 147 Details *Pond Flag 147:*This pond was added to the Wildflower Meadow Program for 2024 and seeded with wildflowers in January 2024. Wildflower meadow ponds are not maintained between March and July to allow the wildflowers to grow, bloom and go to seed. This pond is due for maintenance in August.

  • Drainage Pond Maintenance

    12800 Saint Thomas Dr, Austin

    CLOSED #24-00266172

    Vegetation Maintenance - Close SR. Class: SR Created By: MORGANJ Log Type: VEG_MAINTENANCE Summary: Pond Flag 1019 Details *Pond Flag 1019:*This pond in on our Wildflower Meadow Program and is maintained twice per year, roughly February and August. This pond was last maintained in December 2023 and was seeded with wildflowers in January 2024. I will request the contractor prioritize this one for August since it would have normally been maintained in February and has gone without maintenance longer than some of the other ponds on the Wildflower Meadow Program.

  • Drainage Pond Maintenance

    8300 Palace Pkwy, Austin

    CLOSED #24-00265148

    Vegetation Maintenance - Close SR. Class: SR Created By: MORGANJ Log Type: VEG_MAINTENANCE Summary: Pond Flag 184 Details *Pond Flag 184:*This pond is on our Wildflower Meadow Program and is maintained three times annually: roughly February, August, and November. Wildflower Meadow Program ponds are not maintained between February and August to allow the wildflowers to bloom and go to seed. August is less than one week away so the contractors should be out soon to maintain it.

  • Drainage Pond Maintenance

    Opal Trl & Buggy Whip Trl, Austin

    CLOSED #24-00264964

    Future Work Scheduled - Close SR. Class: SR Created By: BELLK Log Type: WO_CREATED Summary: Contact with Citizen Details Text message sent to citizen on 7/25/24 with photos.

  • Drainage Pond Maintenance

    11017 S 1st St, Austin

    Watershed area has not been maintained in a long time. Grass at least 48 inches tall at sidewalk.

    CLOSED #24-00264180

    Vegetation Maintenance - Close SR. Class: SR Created By: MORGANJ Log Type: VEG_MAINTENANCE Summary: Pond Flag 967 Details *Pond Flag 967:*This pond has received multiple requests in the last two weeks. It is on a six times annual maintenance schedule. It was scheduled last for May but the contractor didn't maintain it until June 12, 2024. However, it is on the schedule again for July. Furthermore when the contactor was there in June, they missed an area along the road near the bus stop. Contractor is aware the area was missed and should be there before the end of July to maintain.

Filters

Status

Ticket Type

  • Drainage Pond Maintenance (Remove)