Requests (833)
-
Bridge Repair
2101 E 51st St, AustinCLOSED #26-00109661Future Maintenance Planned - Close SR. Summary: Investigation Complete - Future Maintenance Planned Details: Thank you for your request. OCE has discussed the issue with Austin Watershed Protection and have a plan in place to address the failing pipe.
-
Bridge Repair
704 E 6th St, AustinCLOSED #26-00109544No Problem Found - Close SR. Summary: No problem found. Details: Thank you for your request. Street and Bridge Operations reviewed and confirmed no problem was found. If you have any questions regarding this request, please contact Street and Bridge Operations Dispatch at (512) 974-8777 and provide work order number 26-208728 as a reference.
-
Bridge Repair
3412 W William Cannon Dr, AustinSmoke emerging from under the bridge close to the intersection of William cannon and Brodie, right by the Taco Bell
CLOSED #26-00104516Referred to 311 For Further Review - Close SR. Summary: Routed to 3-1-1 for reassignment Details: Thank you for your request. Street and Bridge Operations has forwarded this request back to 3-1-1 for the appropriate department assignment. Please forward to Austin Fire Department .
-
Bridge Repair
2101 E 51st St, AustinCLOSED #26-00104377Referred to 311 For Further Review - Close SR. Summary: Made Safe Details: Thank you for bringing this issue to our attention. A Central District crew responded to the site and assessed the collapsed section of sidewalk. It appears that the supporting material beneath the sidewalk has washed away into a pipe running underneath the area. Our crew has secured the location to ensure it is safe. This issue is related to erosion; please route this to the Watershed Protection Department for further evaluation and repair.
-
Bridge Repair
4249 S Mopac Expy NB, AustinCLOSED #26-00104347Future Maintenance Planned - Close SR. Summary: Investigation Complete - Future Maintenance Planned Details: Thank you for your request. Street & Bridge Operations has investigated this asset and documented the lighting issue. Our crews have performed temporary repairs to make the damaged areas safe, and are currently scoping the necessary lighting repairs. The lighting is planned to be restored in a future repair project.
-
Bridge Repair
48 S 1st St, AustinCLOSED #26-00103793Referred to 311 For Further Review - Close SR. Summary: CSR Feedback - Rerout to PARD Details: Thank you for your request. Street and Bridge Operations forwarded this request back to 3-1-1 for the appropriate department assignment - these lights are PARD's to maintain.
-
Bridge Repair
1413 W 38th St, Austinshoal Creek Bridge 38th St. to 35th St. bypass floods southside because blacktop stops up all the bridge drains please remove the blacktop so this flooding doesn’t occur
CLOSED #26-00103634Referred to 311 For Further Review - Close SR. Summary: Routed to 3-1-1 for reassignment. Details: Thank you for your request. Street and Bridge Operations forwarded this request back to 3-1-1 for the appropriate department assignment. Please send to Watershed for initial investigation.
-
Bridge Repair
N Capital of Texas Hwy Nb & N Mopac Expy Svrd Sb, AustinCLOSED #26-00102399Future Maintenance Planned - Close SR. Summary: TPW - Bridge Repair / stolen lights, exposed wires /N CAPITAL OF TEXAS HWY NB & N MOPAC EXPY SVRD SB Details: We are aware of the damage and are assessing the lighting system.
-
Bridge Repair
2800 Tuscan Ter, AustinCLOSED #26-00101015Future Maintenance Planned - Close SR. Summary: Investigation Complete - Future Maintenance Planned Details: Thank you for your request. Street & Bridge Operations has investigated this asset and documented the lighting issue. Our crews have performed temporary repairs to make the damaged areas safe, and are currently scoping the necessary lighting repairs. The lighting is planned to be restored in a future repair project.
-
Bridge Repair
Stuart Cir & Jain Ln, AustinCLOSED #26-00100095Referred to 311 For Further Review - Close SR. Summary: Routed to 3-1-1 for reassignment. Details: Thank you for your request. Street and Bridge Operations has forwarded this request back to 3-1-1 for the appropriate department assignment. Per investigation - concern seems to be related to erosion of material underneath the bridge, which would fall under Watershed.