Requests (1,608)
-
Erosion
CLOSED #25-00020387No Work Planned - Future Project - Close SR. Class: SRCreated By: Log Type: FUTURE_PROJSummary: InvestigationsDetailsThis service request has been forwarded to Watershed Field Engineering team along with the citizen's contact info. See attached photos.
-
Erosion
No erosion controls, discharge of settlement
CLOSED #25-00003052Referred to 311 For Further Review - Close SR. Class: SRCreated By: Log Type: CSR_FEEDBACKSummary: InvestigationDetailsDuring investigation it was determined that the concern is due to new construction. See photos. This needs to be sent to Development Services.
-
Erosion
CLOSED #24-00461399Referred to Internal Workgroup - Close SR. Class: SRCreated By: Log Type: REF_INTERNALSummary: Your request has been referred internally to another workgroupDetailsWork Group referred to: Ingrid Tower Contact Email:Ingrid.Tower@austintexas.gov Contact Phone Number: Reason for referral: Erosion Service Request # CSR24-00461399 as a reference.
-
Erosion
CLOSED #24-00460286No Work Planned - Future Project - Close SR. Class: SRCreated By: Log Type: FUTURE_PROJSummary: InvestigationsDetailsThis service request has been forwarded to Watershed Field Engineering team along with the citizen's contact info. See attached photos.
-
Erosion
CLOSED #24-00454063No Work Planned - Future Project - Close SR. Class: SRCreated By: Log Type: FUTURE_PROJSummary: investigationDetailsAfter my investigation, this will be transfer to Watershed Engineering for further review.
-
Erosion
CLOSED #24-00439608Future Work Scheduled - Close SR. Class: SRCreated By: Log Type: WO_CREATEDSummary: InvestigationDetailsWork order number24-191267 was created for the field crews to inspect the inlet box inside the citizens backyard.
-
Erosion
CLOSED #24-00439491Referred to 311 For Further Review - Close SR. Class: SRCreated By: Log Type: CSR_FEEDBACKSummary: InvestigationDetailsAfter my investigation, this is not a Watershed Protection issue. The inlet box is not damaged, not shifted, no cracks, and no pipe is running behind the inlet box. Please transfer to Street and Bridge sidewalk crew. (See photos in attachments).
-
Erosion
CLOSED #24-00436174No Work Planned - Future Project - Close SR. Class: SRCreated By: Log Type: FUTURE_PROJSummary: InvestigationDetailsI've referred this to the Watershed engineering group to evaluate the concern of erosion. Please expect a phone call from Watershed engineering. I am closing this service request.
-
Erosion
CLOSED #24-00436121No Work Planned - Future Project - Close SR. Class: SRCreated By: Log Type: FUTURE_PROJSummary: InvestigationDetailsThere is an active Erosion site for this location, I will be transferring this over to the Watershed Engineering group. Please expect a phone call. I will be closing this service request.
-
Erosion
CLOSED #24-00422277No Work Planned - Future Project - Close SR. Class: SRCreated By: Log Type: FUTURE_PROJSummary: Investigations.DetailsThis service request has been sent over to the Watershed Engineering group to evaluate the concern of erosion and give the citizen a callback once inspection is complete.