Requests (5,849)
-
Bicycle Issues
Allerton Ave leading to Gorzycki. Numerous cars parked on the bike lane - illegal in Austin. This is a complete mess and there is zero traffic control. This takes place every school day at 4pm. Simply closing reports like this as “resolved” is the reason this problem continues. Wasted community resources on bike lanes plus a high risk of injury to pedestrians, cyclists, and students.
CLOSED #24-00388656Evaluated/Addressed Issue - Close SR. The Transportation and Public Works (TPW) Department has installed a safer routes to school project for students and families at Gorzycki Middle School and Mills Elementary School. The final design was shaped by community feedback heard initially in 2022 and further refined with comments received in subsequent outreach efforts. The project is not fully installed. A centerline was added on Allerton Avenue and additional changes will be made to add more parking spaces. For more information about the project, visit the project webpage here: https://data.austintexas.gov/stories/s/Safer-Routes-to-Gorzycki-Middle-and-Mills-Elementa/g3i2-3b7e/.
-
Bicycle Issues
CLOSED #24-00388333Evaluated/Addressed Issue - Close SR. Concern referred to South Area Engineering office and Pedestrian Crossing Program.
-
Bicycle Issues
CLOSED #24-00388161Evaluated/Addressed Issue - Close SR. The Transportation and Public Works (TPW) Department has installed a safer routes to school project for students and families at Gorzycki Middle School and Mills Elementary School. The final design was shaped by community feedback heard initially in 2022 and further refined with comments received in subsequent outreach efforts. The project is not fully installed. A centerline was added on Hillside Terrace Drive and additional changes will be made to add additional visibility. For more information about the project, visit the project webpage here: https://data.austintexas.gov/stories/s/Safer-Routes-to-Gorzycki-Middle-and-Mills-Elementa/g3i2-3b7e/.
-
Bicycle Issues
CLOSED #24-00388092Evaluated/Addressed Issue - Close SR. The Transportation Public Works Department is evaluating the concern for possible signage placement.
-
Bicycle Issues
CLOSED #24-00387441Evaluated/Addressed Issue - Close SR. Thank you for sharing your request. This request will be evaluated during the Mobility Annual Plan bikeway assessment for future prioritization. The best opportunity to address this request will be with routine maintenance, resurfacing and remarking of the pavement. Transportation Public Works will include this street on a list of potential opporutnities to address bikeways with upcoming maintenance.
-
Bicycle Issues
CLOSED #24-00387336Referred to Other Department - Close SR.
-
Bicycle Issues
Designated pedestrian crossing needed on 38th 1/2 st
CLOSED #24-00387145Evaluated/Addressed Issue - Close SR. This request has been referred to the Pedestrian Crossing Program for evaluation.
-
Bicycle Issues
CLOSED #24-00387124Referred to Other Department - Close SR.
-
Bicycle Issues
Crosswalk request
CLOSED #24-00386958Referred to Other Department - Close SR. Pedestrian Crossing request referred to Pedestrian Crossing Program for evaluation.
-
Bicycle Issues
CLOSED #24-00386740Referred to Other Department - Close SR. This request has been referred to the Sidewalks and Special Projects Division for evaluation.